A contracting group

Project costs that only became visible after the project had already lost money.

Sector
Construction and contracting
Duration
18 weeks
Scope
Custom system · Integrations · Field app
01

The problem

Site engineers recorded labour and materials on paper, sent photographs of the sheets to head office, and someone typed them into a workbook two to three weeks later. Cost overruns surfaced at project close, not during the project. Subcontractor claims were argued from photographs.

02

What we built

A custom project-costing system with a field application that works offline and syncs when the site gets a signal. Materials, labour hours, and equipment are booked against a work breakdown structure at the point they're consumed. Subcontractor claims are raised against the same records. Integrated with their existing accounting package rather than replacing it.

03

The numbers

Cost data lag
−18 days
Field entries logged same day
94%
Active sites on the system
12
Weeks to first site live
3

Example engagements — representative of our work, not client-attributed.