A contracting group
Project costs that only became visible after the project had already lost money.
- Sector
- Construction and contracting
- Duration
- 18 weeks
- Scope
- Custom system · Integrations · Field app
The problem
Site engineers recorded labour and materials on paper, sent photographs of the sheets to head office, and someone typed them into a workbook two to three weeks later. Cost overruns surfaced at project close, not during the project. Subcontractor claims were argued from photographs.
What we built
A custom project-costing system with a field application that works offline and syncs when the site gets a signal. Materials, labour hours, and equipment are booked against a work breakdown structure at the point they're consumed. Subcontractor claims are raised against the same records. Integrated with their existing accounting package rather than replacing it.
The numbers
- Cost data lag
- −18 days
- Field entries logged same day
- 94%
- Active sites on the system
- 12
- Weeks to first site live
- 3
Example engagements — representative of our work, not client-attributed.
Your situation is different. The method isn't.
Start a diagnosis